(De)Construction continues
by brian @ 21:38:59 - [perma-link]More work inside the house today. The new master bath is taking shape. They knocked out the door for the the new toilet room, which will be just outside the current bathroom. The shot from outside shows it a little better. That patio will be enclosed to become a sunroom as part of the Master Suite (lol). The wall is opened up into the former spare-bedroom closet which will become our gigantic shower. Rock. Downstairs they began pulling stuff out of the bathroom. The floor in the downstairs bath is asbestos. I'm guessing the specialists will be here soon to finish the job. On the construction side, they're finishing up on the section between the garage and the house. Windows are in the breezeway. Its almost fully enclosed now. |